Back to Homepage
Back to Homepage



 Spacer  Text Size A  A  A  A | Text Only | 
 

PEOPLE

  • Enews Subscribe
  • RSS Feed
  • Tweet
  • Print
  • Linked-in
  • e-mail
  • Search
Dividing line at page top
Tim Ellis
Dividing Line
TIM ELLIS
Director
BSc HONS   MRICS   ACIArb
Dividing Line


Email Icon timellis@mbmconsult.com

Linked-in Profile www.linkedin.com/profile

V-card Icon Download v-Card

Phone Icon Tel: 01892 557290

PROFILE

Tim’ s delay analysis and planning expertise has helped many clients establish, inter alia, the cause of delay, the effects of change and the status of progress. In so doing he has both saved and recovered for his clients significant sums of money, whilst reducing the inconvenience of such matters place on his client’s team.

Tim is a Director of MBM Consulting Ltd with overall responsibility for planning and delay analysis. Tim specialises in giving advice on project delays, extensions of time and disruption matters both in the preparation of claims and defence. He has also represented both referring and responding parties in numerous adjudications as well as providing expert witness services. Tim also advises clients on project planning and has assisted a number of clients in preparing programmes for acceptance under the ECC form of contract together with tender and contract programmes under JCT forms of contract.

SPECIFIC EXPERIENCE

Tim's experience extends to the preparation and defence of complex time and quantum matters within formal proceedings.  These include numerous adjudication cases and several high profile arbitrations.  Tim has also given oral evidence and been cross-examined within a major hearing.

Tim has a high level of experience of most of the main versions of software used in project programme planning within the industry including Primavera P3, Primavera P3/e, SureTrak, PowerProject Teamplan, Microsoft Project and Pertmaster.

Green Icon Expert witness for a number of appointments

Green Icon Preparation of complex time analysis submissions for contractors

Green Icon Preparation of labour disruption submission for contractors

Green Icon Auditing and review of contractors and sub-contractor extension of time and loss and expense claims.

TRAINING & AFFILIATIONS

Green Icon Honours Degree in Quantity Surveying (Nottingham Trent University)

Green Icon Member of the Royal Institution of Chartered Surveyors

Green Icon RICS Advanced Professional Award in Expert Witness Evidence

Green Icon Member of the Chartered Institute of Arbitrators

Green Icon Member Society of Construction Law

Green Icon Member Adjudication Society

PUBLICATIONS, ARTICLES & CASE STUDIES

Article icon ARTICLE: Extension of Time Claims - 10 Key Considerations
Article icon CES March 2012: Preparation Of Asbuilt Programmes: 10 Top Tips
Article icon CICES Construction Law Review 2011: Programme and record maintenance: Top 10 tips
Article icon ARTICLE: Delay Notices - Top 5 Tips
Article icon CASE STUDY: Preparation of expert witness report
Article icon CASE STUDY: Preparation of extension of time and retrospective forensic delay analysis
Article icon CASE STUDY: Contract analysis, delay analysis and preparation of extension of time, preparation of adjudication documentation and party representation
Article icon CASE STUDY: Preparation of NEC compensation events including analysis of critical delays to demonstrate change to the Completion Date and evaluation of Actual Cost

 

Dividing Line

Key People

Green Arrow JONATHAN BOWCOTT

Green Arrow MICHAEL MULVEY

Green Arrow TIM ELLIS

Green Arrow PHIL KING

Regulated by RICS

Company Nr. 03831301

Accessibility & Legal

Site Map

(c) MBM Consulting Ltd 2011 Website by MBM Technologies